A Technical Energy Survey of the Baggage Handling area at Birmingham Airport revealed that there were potential savings by modifying the existing BMS (Building Management System) to return 19% in electricity & gas savings.
Electrical Energy Cost: |
£12,500.00 |
Total Gas Cost: |
£3,000.00 |
| |
|
Total Savings per annum: |
£3,000.00 |
(19% of Total saved)
|
|
BMS Energy Project Works Cost: |
£1,500.00 |
| |
|
Pay-back period: |
0.5 Year |
Energy saved per annum: |
38 MWH |
Tons of Carbon saved: |
16 Tonnes |
BMS software re-written to allow the plant to operate between selected high/low temperatures only. Demma Integration software logging conditions, training provided for technical Engineers.
(On going savings of £3.0K every year & increasing)